Estimating is considered as one of the most critical stages in a construction project. A precise estimate helps in cost control, budgeting, planning, and decision-making of any construction projects. At different stages of construction and quantity surveying, various types of estimates are prepared at different times, depending on the level of detail and purpose.
In this latest blog from Skillz By Civilianz, clearly explain the various types of estimates in construction projects, their purpose, and where each one is used.
A construction estimate is a calculation of approximation of the total cost required to complete a construction project. It includes costs related to materials, labour, equipment, overheads, and profit. These estimates are essential for various reasons: project approval, tendering, financial planning, and cost monitoring.
Estimates are essential for:
A rough cost estimate, also known as preliminary estimate, is prepared at the initial planning stage of a project, even before detailed drawings are available.
Purpose:
Features:
Accuracy of this estimates widely considered as Low
A detailed estimate is considered as the most important and accurate type of estimate in any construction project.
Purpose:
Features:
Accuracy of detailed estimate is widely considered as High
As its name suggests, a revised estimate is prepared when the original sanctioned estimate exceeds the approved amount.
Reasons for Revision:
Purpose:
A supplementary estimate is prepared when authorities or clients requested any additional works on previously approved projects that were not included in the original estimate.
Examples:
Also notes that it is prepared along with the original estimate.
These two estimates are prepared when we face two issues: the project cost increases or any additional works are also involved. This report combines both the revised cost and extra items in a single estimate.
Annual repair estimate is prepared for routine maintenance works carried out each and every year.
Examples:
The purpose of this estimate is to maintain the building in usable condition.
A special repair estimate is prepared whenever major repair works due to damage or long-term use.
Examples:
Special repairs are different from annual repair estimates that are not done yearly and involve higher costs.
These kinds of estimates are prepared when modifications are required in an existing structure.
Examples:
A quantity surveyor plays a key role in:
To understand the types of estimates required is a fundamental skill for anyone pursuing a career in both the quantity survey or construction management.
Different types of estimates serve different purposes at various stages of a construction project. From the preliminary planning to execution and maintenance, estimates help ensure financial discipline and project success.
For civil engineers, civil diploma holders, and quantity surveying aspirants, mastering estimates is essential for career growth and job readiness. Skillz by Civilianz offers best quantity survey course in Kerala https://www.skillzindia.in/contact/